Monday, July 15, 2013
Hot Yoga Power Yoga Teachers (Hollywood)
Saturday, December 22, 2012
Elsewedy Electric Signs $169m Power Plant Deal
Elsewedy Electric (SWDY), the leading wire cable and integrated energy solution provider in the Middle East and Africa, through one of its subsidiaries, announces the signing of a US$ 169 Million contract in Iraq with the Iraqi Ministry of Electricity to build and operate a new power plant in Diwaniya, with four 125 MW General Electric gas turbines.
The gas-fired 500 megawatt power projects is located 23 km west of Aldiwaniya city and shall be completed within 18-months on an EPC (Engineering, Procurement and Construction) basis. The contract does not include the supply of the four GE gas turbines that have already been purchased by the Government of Iraq from General Electric in a mega deal that consisted of 56 gas turbines in 2008.
Elsewedy Electric’s scope of work includes design, procurement and installation of all balance of plant in addition to the erection and testing of the GE gas turbines. In addition, Elsewedy Electric will be responsible for the spare parts and six months of operation and maintenance after the completion of the project.
The Arab Contractors will be responsible for all the civil, construction and site utilities for the project.
Iraq, holder of the world’s fifth-largest oil reserves, is struggling to raise power supplies, which are currently at about 7,500 megawatts, or half of its domestic demand of about 15,000 megawatts.
Elsewedy Electric’s first office in Iraq was opened in 2006 in Erbil.
(Source: Elsewedy Electric)
.reportView the Original article
Min of Elec takes over Fuel Inspection for Power Stations
View the Original article
Tuesday, December 11, 2012
STX Wins $150m Power Plant Order
South Korea’s STX Heavy Industries has said it has won a $150-million order to construct and operate a power plant in Amara, in Missan province.
Under the turnkey contract signed with Iraq’s Ministry of Electricity, STX will take responsibility for the operation and maintenance of the plant for a year after its completion.
It will be equipped with four 125-megawatt gas turbines, and is to be completed by June 2014.
A 200-MW, diesel-fueled station to the north of Amara was also built by STX and opened in June.
Reuters reports that in July STX won a $195-million contract from a consortium led by Italian energy company ENI to build an oil and gas processing plant in Basra.
(Source: Reuters)
.reportView the Original article
Friday, December 7, 2012
Wednesday, December 5, 2012
Obama leads Forbes power list, Manmohan Singh on 19
The list of top ranked businessman was Microsoft co-founder Bill Gates on number 4. U.s. Federal Reserve Chairman Ben Bernanke and the President of the European Central Bank Mario Draghi, both public officials also came in the top 10.
"List this year reflects the changing of the guard in the world two most powerful countries: the United States and China," Michael Noer, Forbes Executive Editor, told Reuters in an e-mail.
Noer noted that China's President Hu Jintao, third most powerful person last year, fell off the list as he is leaving his successor, Xi Jinping, power, and ninth ranked instead.
U.s. Treasury Secretary Timothy Geithner and Secretary of State Hillary Clinton, who have declared that they will not serve on the Obama second term, were not in the rankings this year.
While elected and appointed officials and business people the vast majority of Forbes most powerful, Pope Benedict XVI placed fifth in the standings.
One of the oddities was Joaquin Guzman Loera on nr. 63.
Loera, is far from a household name, a billionaire nicknamed "El Chapo" who as head of Mexico's Sinaloa cartel drug trader is the world's most powerful people, according to Forbes.
Age was not a barrier, with two of the youngest and oldest of this year is the most powerful — 28-year-old Facebook CEO Mark Zuckerberg and 81-year-old News Corp. CEO Rupert Murdoch — back-to-back at numbers 25 and 26, respectively.
Forbes noted that Zuckerberg fell out last year after top 10 Facebook IPO disappointed. Meanwhile, Brazilian President Dilma Rousseff was a gainer, those four spots to no. 18 despite the fact that moved only halfway into her first term.
You create the rank list, which Forbes recognises easily wore a certain degree of subjectivity, editors classified candidates on four criteria for power and average four ranks:
-Power over many people
-Control over financial and other valuable resources
-Power in multiple areas or arenas
-Active use of power
Some measures, such as power over many people, favored leaders as the Pope, terwijl's world's richest man — Mexican telecom magnate Carlos Slim Hula, worth a reported $ 72 billion — placed 11th on the strength of his wealth.
Others, such as New York Mayor Michael Bloomberg, billionaire scored high in all areas, placing him at no. 16.
Noer said that Elon Musk, one of the co-founders of Paypal and Tesla Motors, was "one of the more interesting newcomers" on the list because of his SpaceX company, a private space-exploration venture.
"With the NASA space shuttle fleet, retire the private companies like SpaceX have large contracts awarded to do things such as resupply the International Space Station. The commercialisation of space has just begun, but we expect that big business, "Noer said.
Former President Bill Clinton placed 50th, with editors noting that by hitting the campaign trail for Obama, Clinton "cemented his status as a pivotal figure", along with his nonpartisan Global Initiative attracting more than 71 billion dollars in commitments for the financing of charitable action worldwide.
Other high-ranking government leaders included French President François Hollande on nr. 14, Indian Prime Minister Manmohan Singh on nr. Iran's Grand Ayatollah Ali Hoseini-Khamenei 19 and number 21.
Among entrepreneurs in the top 20 were Berkshire Hathaway CEO Warren Buffett at no. 15, Wal-Mart CEO Michael Duke at no. 17 and Google founders Larry Page and Sergey Brin on nr. 20.
Reuters
. pagination_articleView the Original article
Syscom 18 Wins Deal for Power Metering Systems
By John Lee.
Syscom 18, the Romanian company specialising in industrial automation and measuring systems, has won a contract worth three million euros in Iraq.
The project involves the “design, construction, installation, electrical and automation side and starting operations of 40 fiscal metering systems”, to be integrated into two power plants; project completion is scheduled for the second half of 2013.
Ion Andronache, President of Syscom 18, commented:
“The fast development pace of the oil and gas segment in the region, but also our previous work experience in other countries in the Middle East, helped us win this project. “Given that the regional markets continued to have a high economic potential, their financial and energy resources remained at important parameters and the Middle East further needs equipment of industrial measurement and control for oil exploitation. “Six years ago still, we decided to orient a significant part of our business efforts to the external market and we did well. This year, about 25 percent of our revenue structure comes from international projects.“He continued:
“Iraq is for us a region of great interest. There are currently some serious opportunities for foreign companies wishing to implement projects in the Iraqi energy field. Their national development plans aim to satisfy, through the large projects of providing electricity, population’s increasing energy demands. “So that power plants will be built, imports of electricity will increase, infrastructure is to be constructed. In other words, large investments into projects are expected, and experienced foreign companies in the field will also have access, those capable to implement short or long-term projects. “Beyond the construction and operation of the power systems and units, opportunities will arise for the training of Iraqi engineers, managers and other staff in the energy sector.“(Source: ACT Media)
.reportView the Original article
Tuesday, December 4, 2012
Thursday, November 29, 2012
Seneca/Ensign rigs switch to LNG for power in Marcellus
To reduce environmental impact and improve the economic performance of US unconventional gas production activities, Seneca Resources Corp and Ensign Drilling have installed two GE gas engines to power the first liquefied natural gas (LNG)-fueled drilling rigs in the Marcellus Shale. Seneca converted the power plants of two existing diesel-powered rigs to use LNG in GE’s 1-megawatt Jenbacher J320 turbocharged natural gas engines. The Jenbacher units were combined with Ensign Drilling-designed rig packages to provide the electricity needed by each rig. The J320 represents GE’s first US Environmental Protection Agency-certified technology for mobile and stationary drilling applications.
In October, Seneca Resources and Ensign Drilling converted their first rig, which is operating in Lycoming County, Pa. The second rig was converted to LNG in November and was assigned to Seneca’s Marcellus Shale gas leases in Forest, Elk, Jefferson and McKean counties.
View the Original article
Monday, November 26, 2012
Handicapped Villager Builds Water Generator, Introduces Green Power
Pages: 1 2 3
View the Original article
Zubaidiyat Power Plant to Start Early 2013
View the Original article
Tuesday, November 20, 2012
Prime Minister Opens Hilla Gas Power Station
By John Lee.
Prime Minister Nuri al-Maliki has inaugurated the new Hilla gas-powered electricity station in Babil province.
Ministry of Electricity spokesman Musab Al-Mudarris said that the station’s total power is 250 MW, using two 125-MW GE generators.
The project was carried out by the Al-Hurra International company at a cost of $84 million, under the supervision of the Ministry of Electricity.
The opening ceremony was also attended by Deputy Prime Minister for Energy Affairs Hussain al-Shahristani and Electricity Minister Karim Aftan
View the Original article
Wednesday, May 16, 2012
Project Manager - Power Plant
Bristol based + multi-site travel
£negotiable
This is a fantastic opportunity to work with a company which focuses on maintaining and extending the life of power plants across the world. As Project Manager you will undertake Project Delivery as directed by the manager of Projects and Engineering.
Key Duties in this role will include:
To undertake Project Delivery as directed by the Manager of Projects and Engineering, to act as the Project Delivery Point of Contact
Direct and manage all aspects of multi-discipline EPC projects from inception through completion
From Sales Handover, define base line scope, programmes and allowances together with the procedures for management of requests for change to allowance/budgets in advance of Project Execution Plan issue
Preparation of the Project Execution Plan for the execution of all project activities in accordance with the Company Business Operating Procedures and specific Client/contract requirements
Develop the organisational structure for a multi-disciplined team from nominated resources essential for the successful execution of the project
Define the policies and processes for clear communications to all parties involved in the project
Manage the preparation and regular update of the Project Schedule against which all project deliverables are monitored and controlled
Initiate and review engineering design, procurement, manufacturing, shipping, sub-contract, project operations and site activity to ensure compliance with project specifications, schedule requirements and Company legal obligations
Optimise completion of deliverables, equipment and services for most cost effective shipment to Client's site
Review Project Financial status and manage change control, taking action to mitigate liability for overrun, variations or third party claims
Report progress in compliance with the Project Execution Plan mandates
Assist and support the Sales, Marketing and Proposals initiatives as directed from time to time as a function of Projects Group Departmental duties
The ideal candidate will be qualified in a related engineering discipline and will have experience of working in a mechanical/electrical engineering EPC environment. You will have a proven track record as a Project Manager and in executing multi-disciplined EPC projects from inception to completion.
You will also have site management experience of multi-disciplined site construction, plant installation, testing and commissioning of project work.
For further information or to apply, contact Joanne at Intec
=======================
Intec (UK) Ltd was established in 1982 by Engineers for Engineers. We deliver Global Recruitment Solutions within the Oil & Gas, Power, Nuclear, Utilities, Rail, Construction and Aerospace Sectors for Owner/Operators, Consultancies, Contractors and Sub-Contractors.
Intec (UK) Ltd is an equal opportunities employer and a member of the Recruitment and Employment Confederation (REC).
=======================
Thursday, April 12, 2012
Senior Planning Engineer - Power & Desalination Project
The scope of work and responsibilities will include the following:
* Review the implementation time schedules which are periodically issued by the Contractor for each sub-project regarding match with the actual progress and achievement of the planned progress.
* Develop and maintain the Scheduler's own implementation time schedules for the purpose of establishing a systematic and consistent estimate of the percentages of completion for each sub-project. Each sub-project shall be broken down into the disciplines Engineering, Procurement, Construction & Erection and Commissioning.
* Present the progress as planned and achieved by the Contractor in form of tables and S-curves for each sub-project and also for the total project (weighted average).
* Monitor and verify Contractor's work progress in all areas for the purpose of progress payments and assist the Project/Site Manager in issuing the payment certificates with all necessary backup and evidence. The primary progress assessment in the field is however done by the discipline engineers.
* Maintain records for all payments made by the Employer to the Contractor. This comprises separate payments for the commercial value of goods/services and for the related VAT.
* Maintain records for all contract variations whether implicitly or explicitly agreed between Contractor and Employer.
* Transfer of knowledge to the Employer's counterpart engineers
* Receive and implement instructions as given by the Project Manager.
* Cooperate in all activities with the PE Site team in accordance with the instructions of the Project Manager/Site Manager.
As Senior Planning Engineer, you will hold a minimum bachelors degree and have a minimum 15 years experience in Planning, Scheduling, Budget and Cost Control of large projects with a minimum 10 years in Thermal Power Projects. You shall be proficient in Primavera Planning and Scheduling software.
In return, you will receive a Tax Free Base Salary plus package.
Keywords: Planning, Scheduling, Budget, Cost, Primavera, Engineer, Power, Thermal, Desalination, Jeddah, Saudi Arabia.
Wednesday, April 11, 2012
Commissioning Mechanicals Power Island
Your tasks will include but not limited to:
" Supervision of site activities such as erection, installation, testing and commissioning
" Factory inspection of equipment at manufacturer and factory acceptance tests.
" Supervision and Monitoring of defined test procedures start up sequences, reliability test runs and performance tests.
" Monitoring of functional and operational tests of various equipments in order to prepare the equipment to the first start up.
" Monitoring of reliability test runs and performance tests.
" Verification of the compliance of test results with the design and reliability requirements.
" Preparation of inspection reports, certificates, progress reports and site correspondence.
Qualifications & Experience required:
" Master's or Bachelor's degree (or equivalent)
" Minimum of seven years of engineering and/or construction and project management experience in power plant projects, at least three years on Commissioning.
Tuesday, April 10, 2012
Construction Manager - CCGT Power
The power plant will comprise of two "Groups"; Group 1 will consist 4 x GE gas turbines in a "4 1 " combined cycle modules; Group 2 consists of 3 x GE gas turbines in a "3 1 " combined cycle module. Air cooled condensers will be provided for the steam turbine cycles.
Group 1 output will be 960 MW net at the Delivery Point, and Group 2 will provide 795.6 MW at the Delivery Point.
Previous experience as Construction Manager on a CCGT power plant is a must preferably some experience in Saudi Arabia. You will be from a Mechanical Discipline.
In return you will receive a TAX FREE Salary & Package
Site Manager - Power & Desalination Project
The scope of work and responsibilities will include the following:
* Act as the Deputy Project Manager and fulfil his duties during his absences.
* Lead the site supervision team including all Senior Site Engineers.
* Plan, direct, coordinate, budget through subordinate supervisory personnel, activities concerned with the construction and maintenance of the Desalination and Power Plant.
* Monitor and inspect all general erection/installation/commissioning activities of the Contractor with regards to progress, compliance with the Contract and applicable codes/standards, quality, safety and environmental acceptance.
* Review and approve Contractor's general erection/installation/commissioning work method statements.
* Review and approve site related general design/ engineering matters submitted by the Contractor.
* Review and approve Contractor's site quality assurance / quality control (QA/QC) system proposed for all general erection/installation/commissioning activities.
* Review and approve the proposed general test procedures for materials/equipment/plant to be tested on Site by the Contractor. Witness such tests and review the related test reports.
* Monitor and verify Contractor's work progress in the general areas for the purpose of progress payments and assist the Project/Site Manager in issuing the payment certificates with all necessary backup.
* Attend the regular (daily/weekly) Site coordination meetings with the Contractor and the monthly progress review meeting.
* Prepare the regular Site progress reports for the general part as required by the Project/Site Manager (weekly and monthly).
* Maintain records for the general part of contractual claims and variations by either the Contractor or the Employer including the necessary evidence
* Inspect and enforce preventive safety and health measures to be taken by the Contractor.
* Inspect and enforce preventive environmental protection measures to be taken by the Contractor
* Review the training program proposed by the Contractor for the Employer's personnel.
* Review the general part of the preliminary (prior to start commissioning) and final (prior to taking over) O&M manuals submitted by the Contractor
* Assist PE's commissioning manager in executing his duties during the commissioning phase of the project. Act on his behalf during his absences.
* Ensure strict adherence of the project procedures, technical and administrative, issued by the Head Office and the Project Manager. In case of difficulties in application of such instructions, the Project Manager shall be consulted before any other actions are being taken.
* Receive and implement instructions as given by the Project Manager.
* Cooperate in all activities with the PE Site team in accordance with the instructions of the Project Manager
In return, you will receive a Tax Free Base Salary plus package.