Scotland - Central Belt
£Negotiable
6 Months - 1 year
We are currently recruiting for a Construction Manager / Engineer to join our clients team based in the Central belt of Scotland for an expansion phase of projects to a large pharmaceutical site. The ideal candidate will hold an IOSH or NEBOSH as well as having experience within the construction of petrochemical, chemical or pharmaceutical sites.
Accountability:
Ensuring the planning, management and implementation of all construction activities match GSK requirements with respect to safety, security, contractor logistics, construction related GMP, timescale and to act as the interface between all contractors and GSK operations. Management of fixed price work. The Construction Engineer will retain responsibility for managing construction activities and for ensuring quality and adherence within scope for the Hydroxy Acid Project. Associated HA stores, from delivery on site to issuing from HA stores. All safety KPI's to GSK requirements and required reporting procedures.
Responsibilities:
Ensure construction activities comply with local and GSK standards.
Communicate with GSK project managers, team members and the contractors.
To oversee and monitor the construction activities associated with all Projects and facility work.
Liaise with GSK departments, including but not limited to; maintenance, manufacturing, production operations, facility operations, EHS and security to ensure minimum disruption to operations.
Manage the contractor's compound for HA requirements, cabins facilities and housekeeping.
Take active role in the contractors compound management team.
Implementation and management of the Construction Safety Plan and the Traffic Management Plan updating as the project progress and changes.
To ensure that a comprehensive Safety Plan is prepared by the contractor for each project and is updated, to coordinate each Project construction activity with GSK operations. Ensure the applications of RAMS (Risk Assessments and Method Statements) are embedded in day to day construction activities.
Manage the HA construction stores - from delivery of equipment to site, both GSK and Doosan orders, inspect and report any damage on arrival to project team representative.
Issue from HA stores to construction team
Ensure issued goods are treated with respect and protected against damage.
Manage GRN, documentation and manuals issue back to project team.
All relevant PTW's are in place and in use.
To ensure that construction issues are addressed through all phases of the project life cycle.
To ensure that the project delivers all statutory and regulatory requirements in the construction arena and complies with all relevant local, GSK, EHS and GMP guidelines and standards.
0 comments:
Post a Comment