Sunday, August 18, 2013

Japan gets 1st reprocessed nuclear fuel since 2011

TOKYO — A nuclear power plant on Thursday received the first shipment of reprocessed reactor fuel to arrive in Japan since the 2011 Fukushima disaster, although it will not be used until the facility gets government approval to restart its reactors.

The fuel, a mixture of uranium and plutonium oxide called MOX, arrived aboard a freighter from France at the Takahama nuclear power station on the Sea of Japan coast in western Japan. Dozens of anti-nuclear activists rallied outside the complex, chanting slogans against the shipment and use of plutonium-based fuel.

Plant operator Kansai Electric Power Co. is hoping to use the fuel once it gets the go-ahead to restart the reactors, reportedly by early next year.

All but two of Japan’s 50 nuclear reactors have been closed for safety checks and upgrades since a tsunami and earthquake in March 2011 touched off meltdowns and explosions at the Fukushima Dai-ichi plant, northeast of Tokyo, causing extensive damage and massive radiation leaks.

The shipment, initially planned for arrival in early 2011 for use in the No. 3 reactor at the Takahama plant, had been delayed amid growing anti-nuclear sentiment and uncertainty over Japan’s fuel cycle policy following the Fukushima accident.

MOX is particularly controversial because it contains plutonium. Japan has a growing stockpile of plutonium extracted from spent fuel rods, and wants to use it to create more nuclear power, in part to help reduce the amount of nuclear waste it must store. Opponents of that policy contend that using plutonium-based fuel is less safe, and note that the reprocessed material could be used to make nuclear weapons.

Japan’s fuel cycle program has been hit not only with opposition but with technical setbacks. It has tried to test a “fast breeder” reactor that is supposed to achieve self-sustainable cycle of plutonium-based fuel, but that has been shut down for years due to a series of accidents and safety violations. Other nuclear reactors in Japan can use MOX, but only in combination with a larger amount of uranium fuel, and only if local communities accept it.

And although a plant in northern Japan reprocesses spent waste into plutonium, the country lacks a facility to use that plutonium to produce MOX. Because Japan still lacks its own MOX fabrication capability, Japanese nuclear plants that use MOX have to send their used fuel to French nuclear fuel company Areva SA for reprocessing and MOX fabrication.

Kansai spokesman Takahiro Senoh said resumption of the MOX fuel shipment reflected the government’s policy to keep nuclear energy and its nuclear fuel cycle program alive. He said details of the shipment, such as the amount of MOX delivered, could not be released for security reasons until it was safely brought into the No. 3 reactor building following necessary checks.

The No. 3 reactor used MOX before it went offline for routine inspection in February 2012. Some MOX fuel had already been stored at another reactor facility at the plant.

Since taking office in December, Prime Minister Shinzo Abe’s pro-nuclear, pro-industry government has campaigned for a resumption of safe reactors, while aggressively trying to export nuclear technology to emerging countries such as Vietnam and Turkey.

The government watchdog Nuclear Regulation Authority last week announced new regulations, taking effect July 8, that pave the way for utility operators to restart their reactors, if they pass inspections under new safety rules that have been made compulsory for the first time.

Kansai Electric said it plans to apply for inspection of two reactors each at Takahama and the nearby Ohi plant when the new rules take effect. Several other companies are also expected to file for inspection of a total of about 10 reactors.

Watchdog chairman Shunichi Tanaka has said inspections will take about six months but he has kept mum about which reactors will be examined first.


View the original article here

Trucking Safety/Dispatcher (carson)

BI LINGUAL SPANISH/ENGLISH preferred but not required. Posting ID: 3679398436

Posted: 2013-03-13, 3:01PM PDT

Edited: 2013-03-13, 3:01PM PDT

email to a friend


View the original article here

Enbridge line shutdowns sap output as U.S. crude gains on Europe

An Enbridge Inc. oil pipeline sits under construction near Fort McMurray, Alberta, Canada. Brett Gundlock/Bloomberg

Enbridge Inc. (ENB)’s shutdown of Alberta pipelines capable of moving 1.17 million barrels a day toward U.S. markets is shrinking output and boosting U.S. crude to the highest level against Europe’s benchmark oil since 2011.

The company’s Athabasca and Waupisoo lines, carrying oil from northern Alberta’s rapidly expanding oil-sands operations to hubs farther south, remained closed today, with the exception of a segment from Cheecham to Hardisty. Nexen Inc. and Suncor Energy Inc. (SU), facing transportation limits, cut output.

Restricted pipeline flows to the U.S., dependent on Canada for 25 percent of oil imports, are buoying U.S. benchmark West Texas Intermediate crude to the highest level against European counterpart North Sea Brent in almost 30 months. A prolonged outage would support a further narrowing of the WTI-Brent gap, already forecast to shrink to $5 a barrel this year as new conduits bring Canadian and U.S. shale oil to the Gulf Coast.

“It’s still unclear how long they’re going to be completely down,” Andy Lipow, president of Lipow Oil Associates LLC in Houston, said by telephone yesterday. “Every additional day that Enbridge Canada is down supports the WTI price.”

Alberta, where oil output is on course to more than double to 3.8 million barrels a day by 2022, sent 1.7 million a day to the U.S. in 2011, provincial government figures show. Kinder Morgan Inc. (KMI)’s Trans Mountain and TransCanada Corp. (TRP)’s Keystone pipeline expansions are being proposed to help move Alberta’s growing oil volumes to markets elsewhere in Canada and the U.S.

West Texas Intermediate for August delivery on the New York Mercantile Exchange climbed 14 cents to settle at $95.32 a barrel yesterday. The oil’s discount versus Brent narrowed 4 cents to $5.94, the smallest since January 2011, and was back above $6 in electronic trading late yesterday.

WTI Rises

The WTI-Brent gap will narrow to $5 by the end of 2013 as pipeline capacity moving oil from Canada and U.S. shale plays to the Gulf Coast increases and demand for the crudes rise, Vikas Dwivedi, a Houston-based global energy strategist for Macquarie Group (MQG), said in a research note June 24.

“Fast-moving, bearish macro factors and corresponding central bank responses are pushing Brent crude fundamentals to the sidelines this summer,” he said. “The WTI-Brent spread will continue to tighten on supply-demand and logistics fundamentals.”

TransCanada’s Keystone project, facing opposition from environmental groups and under review by the U.S. State Department, will be built only if it doesn’t “exacerbate” carbon emissions, President Barack Obama said yesterday at Georgetown University in Washington.

Obama’s Stand

“The net effect of the pipeline’s impact on our climate will be absolutely critical to determining whether this project is allowed to go forward,” he said.

Enbridge, the largest transporter of Canadian crude to the U.S., shut the Athabasca and Waupisoo systems after finding a 750-barrel spill on June 22 from Line 37, a link on the Athabasca system serving Nexen’s Long Lake oil-sands complex.

The shut lines restricted Suncor’s ability to move product out of the region, Chief Executive Officer Steve Williams said in a statement June 24. Canadian Natural Resources Ltd. said yesterday that operations are stable.

Nexen is running the Long Lake complex at reduced rates as the company works with Enbridge to determine when repairs on Line 37 will be completed, Patti Lewis, a Nexen spokeswoman in Calgary, said by e-mail June 24.

Startup Plan

Enbridge will need to submit a startup plan to the Alberta Energy Regulator before returning Line 37 to service, Darin Barter, a spokesman for the agency in Calgary, said by e-mail yesterday. The company restarted the southern section of the Athabasca system from Cheecham to Hardisty late June 23.

Operations on the system north of Cheecham remain down, the company said yesterday.

Enbridge’s Ozark pipeline from the oil hub of Cushing, Oklahoma, to Wood River, Illinois, has been shut for maintenance that was extended to June 29, mitigating the effect of the Canadian constraints on WTI, Lipow said.

“Every day that the Ozark pipeline is down has a countervailing effect,” he said.

Enbridge said June 24 that it may clear the Waupisoo line to Edmonton from Cheecham for startup as early as yesterday. The Long Lake lateral may be down for an “extended period” because of wet conditions, the company said in a statement.

Long Lake

“Other options to support the Long Lake project’s requirements are being evaluated,” Enbridge said.

Western Canada Select strengthened a second day against the U.S. benchmark WTI, gaining 25 cents to a discount of $16.50 a barrel yesterday, its highest level in almost a week, according to data compiled by Bloomberg. Syncrude also advanced 25 cents versus WTI yesterday, to a premium of $3.50.

Suncor said it doesn’t expect the temporary output reduction to affect annual production. Oil-sands output will total 350,000 to 380,000 barrels a day this year, with Syncrude output totaling 34,000 to 38,000, the company said April 29.

Flooding in Alberta may have affected the integrity of Line 37, according to Enbridge. Line 36, which parallels Line 37, was already shut at the time of the leak, Whelan said by e-mail June 22.

Athabasca Line

The 30-inch Athabasca pipeline, also known as Line 19, has a capacity of 570,000 barrels a day, depending on the viscosity of the crude flowing through it, according to the company’s website. The line runs from the Athabasca terminal to the Hardisty terminal.

The 237-mile (381-kilometer) Waupisoo pipeline, operating since June 2008, runs from Enbridge’s Cheecham terminal to Edmonton. The line, also known as Line 18, has an annual capacity of 600,000 barrels a day depending on the viscosity of the crude load, Whelan said.


View the original article here

Technical Trainer- Los Angeles (Century City)

Would you like to work for a company that was voted The Best Court Reporting Services provider in California by readers of a popular law publication?

We are, indeed, the leader in the court reporting profession and we are actively seeking an experienced Technical Trainer to join our team and work directly with our sales staff and law firm clients. We will look to you to train one-on-one and conduct live and web-based group presentations on Adobe Acrobat, litigation support products, video streaming, etc.

The appropriate candidate has strong and friendly communication skills and is comfortable in presenting generic and industry-specific software applications and associated technical support solutions to non-technical professionals within the legal industry. Comfort in utilizing both PC and a Mac platform is important. The right individual will provide support to a sales team that includes representation throughout California as well as Chicago and New York City. Experience in graphic arts is a plus.

Training will be provided for company specific technology.

We offer a competitive wage and benefit package including fully paid health, dental, parking and vacation/sick time. Must pass extensive background investigation and reference check.

Some flying, driving, and overnight travel is required.

Please send resume, cover letter and salary history to Timothy Mertes.

Thank you.
Posting ID: 3678629055

Posted: 2013-03-13, 9:37AM PDT

Edited: 2013-03-13, 9:37AM PDT

email to a friend


View the original article here

Driller - Patterson-UTI Energy Inc. - Fruita, CO

The Driller is responsible for monitoring well conditions and drilling parameters. Additional responsibilities include delegating tasks to Derrickhand, Motorhand, and Floorhands based on drilling activities. The Driller must be able to communicate with a variety of outside individuals including the Company Man and Directional Driller.

Detailed Description

Key relevant tasks performed by a Driller include the following:
Oversee all drilling activities and monitor hands that are working on rig floor Follow established plan for drilling operations Continually monitor well conditions and drilling parameters Provide leadership, along with the Rig Manager, to delegate tasks, instruct, train, and develop all hands Ensure regular maintenance of all equipment and machinery Assist Rig Manager with preventing and solving problems to keep the rig operational Communicate with Rig Manager, Company Man, and Directional Driller as necessary Responsible for well control General upkeep and housekeeping of the Driller’s cabin Maintain daily logs of drilling activities Supervise hands and assist with rig up / down procedures Support other crew members as needed, ensure compliance with safety procedures, and other additional tasks as assigned
Job Requirements

To qualify for a Driller position, an individual must be willing and able to safely perform the following essential job functions :
Stand or sit at the driller’s console for up to 12 hours with minimal ability to leave the driller’s cabin Occasionally climb steep stairs and walk on steel grating and decking, which may be slick. Additionally, they will be walking on boards, gravel, dirt, mud, ice, and snow. Manually operate equipment at driller’s console, which consists of touchscreens, buttons, keyboard, joystick, and levers Clear vision to judge near and far distances to maintain awareness of, watch, and report ongoing work activities to coworkers and third parties Utilize proper hand signals when working from the cabin to communicate with others Accurate recall over short and long-term memory Maintain spatial orientation and awareness to operate drilling equipment, be aware of others’ location in relation to drilling activities, and safely move around work environment with many moving objects Stay continuously alert and focused up to12.5 hours while independently performing repetitive and routine activities and be able to remain calm and continue working in the event of a problem situation Make sound and quick decisions in a changing and hazardous environment Demonstrate clear communication skills and ability to promptly follow directions Take initiative and work independently during downtime Wear Personal Protective Equipment (PPE) at all designated times Education Requirements and Knowledge

The Driller job requires a high school diploma, certificate or equivalent. A Driller must be able to use a computer and multiple screens to monitor drilling activities. This person must understand down hole operations and daily operations to be able to give instructions to hands. The Driller must be able to use a calculator, standard formulas, and basic math for well control calculations.

Certification Requirements:
Well Control

Supervisory Responsibilities:
Derrickhand, Motorhand, and Floorhand

Additional Details

This position requires the person to work outdoors for an entire tour work shift in all types of weather conditions, including precipitation, cold / heat, high wind, and turbulent conditions. They will be exposed to the typical conditions of the local area where the rig is located. The Driller must work with an emphasis on safety for themselves and others including coworkers and third parties. They must be able to work closely with others as they will work together in the confined area of the drilling rig and may choose to live together in crew quarters. They must be willing to work a hitch, which consists of 7 days on / 7 days off, or 14 days on / 14 days off, working 12.5 hour shifts that can include days or nights and as well as weekends and holidays

How To Apply

To apply, click the "apply now" button at the lower right hand corner of the screen and follow the directions

Amount of Travel

Constant Travel

Work At Home

No
Patterson-UTI Energy Inc. - 2 days ago - save job - block Derrickhand
Patterson-UTI Energy Inc. - Fruita, CO
Patterson-UTI Energy Inc. - 2 days ago

Independent Contractor - Reefer
Prime Inc. - Grand Junction, CO
Prime Inc. - 2 days ago

Motorhand
Patterson-UTI Energy Inc. - Fruita, CO
Patterson-UTI Energy Inc. - 2 days ago

Patterson-UTI Energy, Inc. is a provider of contract drilling business. It operates primarily in Texas, New Mexico, Oklahoma, Arkansas, Loui...

View the original article here

Security Officers (Los Angeles / Vernon)

Part-Time/On-Call shifts are for 0 to 32 hours per week, various shifts, Subject to be on call for more hours. Position may turn into full or part time in the future if available.

All positions must be willing to work overtime.

* Be a skilled Professional, and provide excellent Customer Service.
* Respond to unusual or emergency situations using appropriate protocol.
* This position requires patrols to inspect the interior, exterior, protection devices and fire control equipment at the facility. Certain aspects of this job involve walking, climbing stairs and standing for extended periods of time.
* Prevent unauthorized access to the facility, and enforce site policies by communicating effectively.
* Be self-motivated, highly observant and exhibit consistent attention to detail.

* Must have valid, current, State of California BSIS Guard Card.
* Have a valid, current California driver's license and clean driving record
* Submit 10 year employment history
* Be at least 18 years of age
* Be a high school graduate or have G.E.D.
* Be a US Citizen or have necessary authority from the INS to be employed as a security officer
* Have reliable transportation
* Have strong verbal and written skills
* Complete character and reference background check
* Complete and pass a criminal background check

Please reply with a current resume that includes your phone number.
Posting ID: 3678625457

Posted: 2013-03-13, 9:36AM PDT

Edited: 2013-03-13, 9:36AM PDT

email to a friend


View the original article here

CREW CHIEF - Workover Rigs - Roosevelt, UT - Nabors Industries - Roosevelt, UT

Under the direction of a Rig Supervisor, the Crew Chief organizes the rig crew, conducts Job Safety Meetings, delegates the collection of materials and equipment needed to perform the contracted services, drives the Rig to the work site, operates the rig and equipment and directs the crew to set-up and prepare the rig for the tasks to be performed. Directs the assigned crew workers and derrick workers to safely perform the service tasks contracted by a client utilizing the equipment provided by the employer; documents services performed the billable supplies used during the process and the time elapsed while performing the contracted services Also records employee compensable time.

ESSENTIAL FUNCTIONS:
1. Available to work beyond the traditional 8 hour work day; available to work Saturdays, Sundays and Holidays, to meet operational needs. Well services work is generally performed during day-light hours, Monday through Friday, occasionally on Saturday and or Sunday. Certain operations cannot however be completed during a single daylight period and must be continued without interruption, over several consecutive days. Such operations are referred to as “24 hour operations,” and require two or more shifts, crews, to operate the rig. Able to work at heights up to or greater than 50 feet.

2. Dependability is imperative. Reporting for work at the prescribed location and time, dressed for deployment to work, is essential. Unauthorized absences will result in discipline up to and including employment termination.

3. Compliance with public laws and company policies is essential. Non-compliance will result in discipline up to and including termination of employment.

4. Drive rig and other vehicles assigned to the project.

5. Must be available for work as needed regardless of time of day or day of the week; and occasionally be available for shift work. Well services work is generally performed during day-light hours, Monday through Friday, occasionally on Saturday and or Sunday but may occasionally involve 24 hour shift work.

6. Position the rig, raise and lower the mast. Direct other crew members in rigging up guy-lines, various equipment and tools; lift, remove, install and operate wellhead, pumping units matting boards, tubing, rods, casing, rod strippers, polish rods, stripper heads and other production equipment in a manner consistent with safe operating procedures to perform the contracted services.

7. Directs the crew members in performing routine maintenance and repair activities of the rig and rig tools

8. Complies with the client’s and the company’s safe operating procedures. All activities are to be performed consistent with the company’s Safe Operating Procedures, to provide the maximum protection for all workers at the work site, the environment, the equipment; and complete the tasks efficiently.

9. Conducts safety meetings and performs JSA’s with his crew members and other service providers on site.

10. May be required to drive a company, light or DOT regulated commercial vehicle.

11. Completes the Field Service Reports, documenting services performed, equipment used, billable consumables and compensable crew time.

12. Incumbent employee is expected to participate in company provided training in rig operations, Standard Operating Procedures and safe work procedures.

13. Performs the primary thinking called for and encompassed by the overall Position Definition.

14. Adheres to company policies and work requirements.

15. Performs and assumes other duties and responsibilities as may be required by immediate supervisor.

16. Heavy Work- Exerting 50 to 100 pounds of force occasionally, and/or 25 to 50 pounds of force frequently, and/or 10 to 20 pounds of force constantly to move objects. Physical Demand requirements are in excess of those for Medium Work.

17. This position requires standing, walking, and sitting while working either indoors or outdoors.

18. While performing the job, the Crew Chief will be required to lift/carry, pull/push, reach, squat, kneel, and or climb ladders or stairs.

19. Working conditions for this position may involve exposure to varying environmental conditions. This may include chemicals, gases, cold/heat, noise, dampness, dust, fumes, radiation and heights. Exposure to the above conditions should be handled as prescribed in the Company’s Accident Prevention Handbook and/or the Company’s Standard Operating Procedures.

20. Other requirements include mental, physical and manual dexterity, hand/grip strength, depth perception and any other physical attributes that enable the employee to perform the job safely according to all Company, local, State, and Federal regulations and requirements.

21. This position requires the ability to wear personal protective equipment and/or safety equipment including safety glasses, face shields, goggles, ear muffs/plugs, steel toe boots, hard hat, full body harness with applicable fall protection devices, SCBA (Self Contained Breathing Apparatus), H2S detectors, slicker or TYVEK suits and gloves.

Qualifications

REQUIREMENTS:
Pass the company’s drug screen.Pass the company’s “Physical Functions Assessment.”Motor Vehicle Record qualifies individual to be an approved company driver.Acceptable criminal historyAbility to read, write and speak English to the extent that they are able to understand verbal and written instructions as well as give verbal and written instructions in English; and the ability to use simple mathematical calculations using whole numbers, fractions and decimals (addition, subtraction, division and multiplication) to make job related calculations.Two years or more of recent, prior Workover rig operating experience.Well Control training certification.Available to work beyond the traditional 8 hour work day; available to work Saturdays, Sundays and Holidays, to meet operational needs.Able to work at heights up to or greater than 50 feet.Prior First Aid, CPR, H2S, confined space entry, defensive driver training, is an asset.Job

View the original article here